RLC team only. Paperless field book for APFC sizing. Nothing on a page is mandatory — save and come back.
PIN is a team gate, not a vault. Do not share outside RLC.
← Back to nikhilnakka.comDrafts live in the browser on this device. Export Excel / zip before you clear site data.
Skip any box. GPS is optional — tap when you are at the DB.
Bill PF is not Q if a capacitor was in circuit that month. Upload a bill photo to draft the boxes — you review before anything is written.
True-Q snapshots need every bank OFF. Today’s 20 kVAR find belongs here.
Pick a common load or Other. Nameplates only — leave kW blank if you cannot read it.
Clamp the same tails every time. Mark LAG or LEAD from the meter face.
Tag the service before you shoot. GPS is stored on the photo if the phone allows it.
Uses only snapshots you typed. Empty fields are ignored, never invented.
Nothing is saved until you apply. Uncheck any line that looks wrong.